2009年11月28日土曜日

IEWB Vol.II Lab 2 の進捗

CCIE Routing & Switching Lab Workbook Volume II (Dynamips Edition) を使ってラボ試験対策を実施中です。進捗を記録していくつもりです。

Lab 1

2009/11/26 完了

Lab 2

1. Bridging & Switching, 7 / 16 Points
1.1. VLAN Assignments, 2 Points, ×, 2009/11/28
1.2. EtherChannel, 2 Points, ○, 2009/11/28
1.3. EtherChannel, 2 Points, ×, 2009/11/28
1.4. Link Aggregation, 3 Points, ○, 2009/11/28
1.5. Trunking, 2 Points, ×, 2009/11/28
1.6. Pruning, 2 Points, ○, 2009/11/28
1.7. 802.1x Authentication, 3 Points, ×, 2009/11/28
2. Freme Relay, 4 / 9 Points
2.1. Full Mesh, 2 Points, ×, 2009/11/29
2.2. Point-to-Point, 2 Points, ○, 2009/11/29
2.3. Point-to-Point, 2 Points, ○, 2009/11/29
2.4. Frame Relay Traffic Shaping, 3 Points, ×, 2009/11/29
3. HDLC/PPP, 2 / 4 Points
3.1. HDLC, 2 Points, ○, 2009/11/29
3.2. PPP, 2 Points, ×, 2009/11/29
4. Interior Gateway Routing
4.1. OSPF, 2 Points, ○, 2009/12/3
4.2. OFPF, 2 Points, ×, 2009/12/3
4.3. OPSF, 2 Points, ○, 2009/12/3
4.4. EIGRP, 2 Points
4.5. EIGRP, 2 Points
4.6. EIGRP, 2 Points
4.7. EIGRP, 2 Points
4.8. Routing Redundancy, 3 Points
4.9. RIPv2, 2 Points
4.10. RIP Filtering, 2 Points
4.11. IGP Redistribution, 3 Points

参考

0 件のコメント: